29 named things its latest annual report says its results depend on, each in the company's own words. 14 of them are also named by other companies we've read.

Customers

CoreWeave, Inc.

earns from · 100% of our Colocation segment revenuenamed as a risk
One customer, CoreWeave, currently accounts for 100% of our Colocation segment revenue.Risk factors (Item 1A)

Also named by APLD, GLXY

Suppliers

Bitmain Technologies Limited

depends on · substantially all of our minersnamed as a risk
Historically, we have sourced substantially all of our miners from Bitmain Technologies Limited (“Bitmain”), one of the leading manufacturers of digital asset mining equipment.Business (Item 1)

Tennessee Valley Authority

depends on · 150 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Also named by OKLO, PPL

Duke Energy

depends on · 82 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Also named by ENB, PRIM

Denton Municipal Electric

depends on · 394 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Texas-New Mexico Power

depends on · 300 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Dalton Utilities

depends on · 195 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Oklahoma Gas & Electric

depends on · 100 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Nodak Electric Cooperative, Inc.

depends on · 100 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Alabama Power Company

depends on · 50 MW
The table below summarizes the gross utility power capacity in MW by facility location and electric utility provider as of December 31, 2025:Business (Item 1)

Block, Inc.

depends on
In 2024 we entered into an agreement with Block, Inc. a technology company developing ASICs, to acquire 3 nm ASICs customized for digital asset mining.Business (Item 1)

Partners and platforms

Coinbase Global, Inc.

depends onnamed as a risk
Certain digital assets held by us are stored using Coinbase Global, Inc. (“Coinbase”), a third-party digital asset service.Risk factors (Item 1A)

Mining pools

depends onnamed as a risk
We utilize third party mining pools to receive our earned mining rewards from a given network.Risk factors (Item 1A)

Places

Texas

operates in · 3
As of December 31, 2025, we owned or leased ten data centers in Alabama (1), Georgia (2), Kentucky (1), North Carolina (1), North Dakota (1), Oklahoma (1), and Texas (3) totaling 920 MW of total leasable customer power capacity, or 1.4 GW on a gross utility power capacity basis.Business (Item 1)

Also named by ABR, AFRM, ALLY, AN, ASO, ASTS, ATO, AXP and 70 more

Hazards

Extreme temperatures and grid curtailment

named as a risk
The Company’s colocation operations can be affected when extreme temperatures in locations where its data centers operate result in local power price volatility that necessitates economic or grid stabilization-driven curtailment.Business (Item 1)

Commodities and inputs

High-voltage transformers and switchgear

depends on · 12 to 18 monthsnamed as a risk
Certain components, including high-voltage transformers, switchgear, generators and advanced cooling systems, can require lead times of 12 to 18 months or longer, which can materially affect data center construction schedules.Business (Item 1)

Electricity

exposed to its pricenamed as a risk
The costs of electric power therefore account for a significant portion of our cost of revenue.Risk factors (Item 1A)

Also named by AA, AESI, APD, APLD, ATI, ATO, BA, BMNR and 22 more

Regulators

Office of Foreign Assets Control (OFAC)

subject tonamed as a risk
However, because of the pseudonymous nature of blockchain transactions, we may inadvertently engage in transactions with persons named on OFAC’s SDN list.Risk factors (Item 1A)

Also named by ABNB, ADP, AIG, APP, BMI, BMNR, BPOP, CAT and 46 more

Financial Crimes Enforcement Network (FinCEN)

subject tonamed as a risk
To the extent that our activities cause us to be deemed an MSB under the regulations promulgated by FinCEN under the authority of the U.S. Bank Secrecy Act, we may be required to comply with FinCEN regulations, including those that would mandate us to implement anti-money laundering programs, make certain reports to FinCEN and maintain certain records.Risk factors (Item 1A)

Also named by ABNB, ADP, AFRM, BMNR, COIN, EEFT, FISV, SNEX and 2 more

Public Utility Commission of Texas

subject tonamed as a risk
The Public Utility Commission of Texas is required to review and potentially revise the methodology for allocating wholesale transmission charges to large-load customers by December 31, 2026.Business (Item 1)

Also named by AEP, CNP, ETR, NEE, NRG, SRE, VST

Electric Reliability Council of Texas (ERCOT)

subject tonamed as a risk
Facilities interconnecting after December 31, 2025 must install remote-disconnect equipment to enable ERCOT-directed load shedding during grid stress events.Business (Item 1)

Also named by GLXY

Georgia Public Service Commission

subject tonamed as a risk
In Georgia, the Public Service Commission adopted a rule in January 2025 allowing Georgia Power to impose minimum billing requirements, longer contract terms, and site-specific cost allocations on new large-load customers exceeding 100 megawatts, including data centers.Business (Item 1)

Also named by SO

Laws and programs

Investment Company Act of 1940

subject to · 40%named as a risk
If certain digital assets, including bitcoin, were to be deemed securities, and consequently, investment securities by the SEC, we could be deemed an inadvertent investment company.Risk factors (Item 1A)

Also named by ABR, AMG, AMP, ARCC, ARES, BAM, BCSF, BEN and 28 more

U.S. tariffs on China

subject to · up to 25%named as a risk
These tariffs have subjected certain digital asset mining equipment manufactured overseas to additional import duties of up to 25%.Risk factors (Item 1A)

Also named by ESAB, IDCC

Texas Senate Bill 6

subject to · loads exceeding 75 megawattsnamed as a risk
SB 6 applies to customers with loads exceeding 75 megawatts at a single site and requires such customers to contribute to transmission interconnection costs, disclose duplicative interconnection requests, and maintain backup generation or load curtailment capability during grid emergencies.Business (Item 1)

Also named by NRG

Oklahoma HB 3594

subject to
This legislation supports our facility under development for colocation services in Muskogee, Oklahoma.Business (Item 1)

Kentucky House Bill 775

subject to
Kentucky’s expanded data center incentive program, enacted through House Bill 775 in 2025, broadened eligibility for sales and use tax exemptions on qualified data center equipment statewide based on county population thresholds.Business (Item 1)

Accelerating Federal Permitting of Data Center Infrastructure executive order

subject to
While this executive order may benefit our colocation operations by reducing permitting timelines for future expansion, the scope and durability of these measures remain uncertain and subject to change.Business (Item 1)

Technology

Bitcoin halving

6.25 bitcoin to 3.125 bitcoinnamed as a risk
In April 2024, the Bitcoin protocol executed its fourth planned halving, wherein the bitcoin rewards issued for each solved block declined from 6.25 bitcoin to 3.125 bitcoin.Risk factors (Item 1A)